Mining

O3 expands Kierens deposit at Malartic with near-surface gold hits

Drill highlights include 14.2 metres of 2.9 g/t gold starting at 28.3 metres; 10.5 metres of 2.1 g/t gold from 30 metres; and 9.3 metres of 2 g/t gold starting at 28.7 metres.

According to Jose Vizquerra, O3’s president and CEO, these latest drillholes could potentially positively impact a future mining scenario at Malartic.

The Marban project area includes three historic mines, which churned out a total of 585,000 oz. gold between 1959 and 1992

“We are pleased with these latest drill results as they show that drilling can continue to expand the mineral footprint at the various deposits on our Malartic property, which bodes well for growing the resource base and making the Marban project development even more attractive. We also received the pleasant surprise of intercepting mineralization just below the surface, which could have a meaningful positive impact in a future production scenario,” Vizquerra said in a release.

In its 2020-2021, 150,000-metre drill program, the junior is planning to complete 45,000 metres at Malartic, to test for extensions of existing deposits and test zones outside of the planned pit areas.

The September PEA, completed on the Marban project within Malartic, defined a 15-year, 11,000 t/d open pit operation, mining the Marban, Norlartic, Kierens, North-North and Gold Hawk deposits.

The Marban project area includes three historic mines, which churned out a total of 585,000 oz. gold between 1959 and 1992.

O3 is part of the Osisko Group and also holds mineral assets in Ontario, as well as in the James Bay and Chibougamau areas of Quebec.

(This article first appeared in the Canadian Mining Journal)

View Article Origin Here

Related Articles

Back to top button