MiningNews

Premier expands high-grade mineralization in Ontario

Drill highlights from up-dip extensions of Epp-C include 17 metres of 4.93 g/t gold; and 3.5 metres of 76.12 g/t gold. Infill drilling within Epp-C returned 7.6 metres of 26.82 g/t gold.

Notable intercepts from Epp-D include 11 metres of 4.94 g/t gold; and 2.1 metres of 7.18 g/t gold.

“This drilling campaign intersected gold mineralization in every hole and was often accompanied by visible gold,” Stephen McGibbon, Premier’s executive VP, said in a release.

“In addition to significantly expanding the Epp-C and D zones, we have successfully demonstrated widespread mineralization further to the west toward Buffalo that warrants continued exploration.”

The Hasaga project features high-grade mineralization with true widths of up to 30 metres and is adjacent to Pure Gold Mining’s PureGold mine. The Hasaga site includes the past-producing Hasaga, Buffalo and Goldshore mines.

Premier’s focus for this year is assessing the underground potential of Hasaga. An underground resource estimate is expected by year-end.

Current resources at the site include 42.3 million measured and indicated tonnes, at 0.83 g/t gold, containing 1.1 million gold ounces; and 25.1 million inferred tonnes, at 0.78 g/t gold, for a further 631,000 oz. of gold. These appear to be constrained within pit shells.

(This article first appeared in the Canadian Mining Journal)

View Article Origin Here

Related Articles

Back to top button