MiningNews

Castillo Copper to ramp up work at Mt Oxide project

Geological interpretations of historic and fresh assays suggest a shallow, high-grade scalable copper system apparent at the Big One deposit

The company has said that it also wants to finish the current RC drilling campaign as soon as possible. This program involved drilling 20 holes at Big One, comprising six drill-holes for the 200 series with partial assays for visible copper confirming up to 4.1% Cu and 14 drill-holes for the 300 series with visible copper mineralization apparent in BO_301-06RC.

Once this is completely done, Castillo plans to explore the Arya prospect, start working on modelling up a JORC compliant resource at the Big One deposit and then, subject to the results of modelling, apply for a fresh mining lease.

“With geological interpretations of historic and fresh assays suggesting a shallow, high-grade scalable copper system apparent at the Big One deposit, the Board is optimistic that 2021 will be a transformative year and that significant shareholder value can be created as the Mt Oxide project is developed,” Simon Paull, the firm’s managing director, said in a media statement.

View Article Origin Here

Related Articles

Back to top button